Specify access around wet process areas
Separate walkway panels, removable covers and platform components; review exposure, supports and maintenance access before selecting the configuration.
Identify the location and the maintenance task
Mark walkways, tank-side platforms, removable trench covers, access openings and equipment interfaces on the layout. Identify what must be lifted or removed for maintenance and which parts are supplied or installed by others. This page is a planning guide, not a completed-project case.
Define exposure and the access requirement
List process liquids and cleaning agents with concentrations and temperatures. Distinguish splash from immersion and include outdoor exposure. State wet-surface, clear-opening and access requirements from the project specification rather than assuming a mesh name or surface finish proves compliance.
Review the panel and its supports
Provide clear spans, bearing direction, supports, loading and deflection criteria. Compare the exact mesh, depth, resin and surface; review fixings separately. C-type joining clips are not support hold-down clips.
Turn the review into a supply list
Prepare panel or finished-part quantities, cutouts, holes, edge finishing, component labels, packing and the required drawing/report list. Review grating, profiles, handrails, stairs and connections as separate items where a platform is included.

Choose moulded or pultruded grating
Choose resin from the actual exposure
Read a load table with its support conditions
From a drawing to an agreed component supply
Review technical evidence · Send your project conditions
Relevant product families
38 × 38 × 38 mm moulded grating38 mm-deep moulded FRP grating with 38 × 38 mm mesh for walkway and platform selection. Compare resin and surface options, then send panel sizes and support conditions for quotation.
FRP platforms & access componentsFRP grating, rails, stairs and connections for platform and access projects. Send your layout and component list to clarify the supply, technical evidence and design responsibilities before quotation.